Saltar al contenido

Perazića Do

Etapa 5 de 6

Through the tunnels

3.0 km · 40 min a pie — Roman mosaics of Mirišta → Perazića Do · km 6.3

Perazića Do

Hand-cut tunnels carry the old coast road through the headland, and Budva has documented unsafe sections on a planned 320 m stretch of the path — no completed lighting or guaranteed walking time is on record. Above the shore stands the unfinished Hotel As: contracts from 2002, a company sale in 2009, cases still unresolved in 2025. The Government has initiated a termination proceeding, not completed one.

Qué ver

  • · Hotel As ruin (do not enter)
…

Perfil de elevación

90m170m1km2km3km4km5km6km7km
Paseo completo con mapa
Visa·Mastercard·Amex